Dataset Viewer

The dataset viewer is not available because its heuristics could not detect any supported data files. You can try uploading some data files, or configuring the data files location manually.

Product Dev Ops Playbook — Cross-Functional Sprint Alignment SOP

Complete Product × Engineering × Operations alignment SOP — from unified backlog to 10-day sprint cadence to veto power rules.

📦 Install on ClawHub

clawhub install product-dev-ops-playbook

Then ask your AI agent:

"Design a 10-day sprint cadence for our 8-person product+eng team"

Installs the complete Product × Engineering × Operations alignment SOP — dual-layer Kanban, 10-day sprint cadence, issue templates with reproducibility rules, ops-veto-on-release framework, user feedback → product iteration closed loop.

🔗 View on ClawHub · All Gingiris skills · Author blog

🚀 30-Second Preview

You: 8-person team (3 PM/design, 4 eng, 1 ops). Design our sprint cadence.
Agent (with product-dev-ops-playbook):

  Cadence: 10-day sprint (5-day half doesn't fit AI prototype work)

  Day 1 (Mon) — Sprint planning + kickoff:
    Backlog grooming (45min) → 10-day commitments
    Engineering: pick 3-5 stories with clear acceptance criteria
    Ops: surface customer-blocking issues (auto-escalates if reported ≥3x)
    Veto rules: P0 bugs from ops block any new story acceptance

  Day 2-5 — Build phase:
    Daily standup (15min, async-first via Discord/Slack thread)
    PM unblocks design questions, eng pairs on hard problems

  Day 6 — Testable build deadline:
    Eng ships to staging; ops + PM smoke-test
    Bug triage: P0/P1 fix-in-sprint, P2 defer

  Day 7-9 — Polish + edge cases:
    User feedback batched daily, sprint scope locked

  Day 10 (Fri) — Ship + retro:
    Ops has FINAL release veto if P0 bug present
    Retro: 3 things working, 3 things to fix next sprint

Real cadence with embedded governance — not abstract Agile theater.


What's Inside

  • Dual-layer Kanban system (master backlog + sprint board with unified tagging)
  • 10-day sprint standard process (Day 1 dev → Day 6 testable build → Day 10 ship)
  • Issue template with reproducibility requirements (3x reported = auto-severe)
  • Tri-party alignment meetings (daily standup / sprint planning / sprint review)
  • Operations veto power on releases (P0 bug = block shipping)
  • User feedback → product iteration closed loop (beta testing + interview SOP)
  • Core metrics framework (acquisition → activation → retention → monetization → referral)
  • Technical debt management (20-30% sprint capacity reserved)
  • Ready-to-use templates: Bug Report, Sprint Planning, Responsibility Matrix

Languages

Language File
中文 (Chinese) SKILL.md
English references/en/README.md
日本語 (Japanese) references/ja/README.md
한국어 (Korean) references/ko/README.md

Install (Cola / ClawHub)

clawhub install product-dev-ops-playbook

Author

By @WeiYipei

Downloads last month
46